Russ Nelson's blog

[ Home | RSS 2.0 | ATOM 1.0 ]

Wed, 26 Aug 2015

Ride starting Sat Aug 22 17:02:20 2015

1.77 km 5792.88 feet 1.10 mi 534.00 seconds 8.90 minutes 0.15 hours 7.40 mi/hr

The Putnam County Trail is the former Putnam Branch. It used to run all the way into a wye in Brewster. The path stops short of that because the track is still in use. They're making a rail-with-trail that will jump over the yard on a bridge to join up with the Maybrook Line that used to cross the Hudson at Pok. Only a small portion is built, and even that is still under construction.

posted at: 00:23 | path: /bicycling | permanent link to this entry

Made with Pyblosxom